What Affects Price

Four things that move the number

Area & Layout

Total square metreage, and how broken up it is. Corners, cut-outs, thresholds and edges all take time that open floor doesn’t.

Substrate Condition

A sound, flat existing surface is cheaper to prepare than one needing levelling or repair before the Base coat goes down.

Texture & Colour

A standard trowelled finish in a stock colour is quicker than bespoke colour-matching or a heavily worked texture.

Wet-Area Waterproofing

Wet rooms need the full Barrier stage with mesh at every junction — materially more labour than a dry wall or floor.

Guide Rates

What it typically costs

Guide ranges for planning purposes. A fixed price always follows a site survey, because substrate condition moves the number more than anything else on this page.

ApplicationGuide RangeNotes
Residential floor£110 – £150 / m²Standard trowelled finish over a sound substrate
Residential wall£120 – £160 / m²Dry areas, single colour
Bathroom or wet room£150 – £200 / m²Includes the full Barrier waterproofing stage
Commercial floor£110 – £170 / m²Varies with access, footfall spec and programme
Worktop, island or vanityFrom £850 / unitPriced individually, not per m²
Minimum project value£3,300The system takes 4–7 days regardless of area

Why there’s a minimum project value

The Oltre system is applied in layers with curing time between each, so a small bathroom takes almost as many days as a large one. A minimum keeps pricing honest rather than loading a per-metre rate that would look absurd on a bigger job.

How Payment Works

Staged against milestones, not dates

You pay for work that has been done, at points you can see and verify. The final payment always comes after the handover walkthrough — never before it.

Project ValueOn AcceptanceAt ApplicationOn Handover
Up to £3,00040%—60%
£3,000 – £15,00030%40%30%
Above £15,000 & commercial20%Staged by milestoneBalance

Full terms are set out on the terms of business page.

Why there’s a deposit at all

Oltre materials are ordered and colour-matched for your specific project. They can’t be returned or used on someone else’s job, so the deposit covers a real cost rather than simply holding your place in the diary.

Why the middle payment exists

On larger projects the second stage falls after substrate preparation — the unglamorous part that determines whether the finish lasts. It is real work, so it is invoiced as such.

Why the balance comes last

Holding the final payment until after handover is your protection. Any installer unwilling to work that way is telling you something.

Your cancellation rights

For work agreed at your home you have a statutory 14-day cancellation period. If you want work to start sooner, that’s fine — it just needs confirming in writing first, and I’ll set that out for you.

Before You Book Anyone

Six questions to ask any quote — mine included

  • Is that rate labour and materials together, or materials only?
  • Is VAT included in the figure you’ve been shown?
  • Does it cover substrate preparation, or is that extra if problems are found?
  • Is the installer approved by the manufacturer of the system being used?
  • For a wet room: is the full waterproofing stage included, with mesh at the junctions?
  • What is the payment structure, and is the final payment due before or after handover?

Want a real number?

Send your project details and I’ll give you a fixed quote rather than a range.

Request a Quote